In this post, a few more photos of the cryostat setup, and the mega rack of monitors that Penn uses.
|
||||
In this post, a few more photos of the cryostat setup, and the mega rack of monitors that Penn uses. Last week the BLAST cryostat arrived to begin the first full(-ish) integration of BLASTpol. Upon arrival it was undressed and bore its tender bits, to have travel legs replaced with thermally isolating ones. Also the HWPR (pronounced “hooper”, despite what Natalie may say about whatever the “whipper” is) had to be removed and sent immediately […] Juan has taken on fixing and programming the inner frame balance pump. Presumably he took these pictures. While I was in Philadelphia (a couple months ago now…I’m still posting old pictures), everyone back in Toronto was working really hard to get the gondola pointing, the star camera mounted, and sun shield completely assembled. All this in preparation for the PIC (which can be thought of as “the pick”), at which NASA decides […] I downloaded a bunch of pictures today, and there are a startling amount taken of the lock pin. So I figured I’d post at least some of them, and combine it with a few I took long ago while repairing it. |