We stared the gluing process with the less demanding joints: the scoop and the tubes that will be under compression. As we got better we moved into the more demanding tubes.
We used a jig to fix the clocking of the inserts, we cured the tubes vertically in the jig for 24 hours and then take them out to cure to full strength, which take around 10 days. For every batch of tubes (we glued around 8 tubes per day) we made a test tube.
- Sanding and acetoning
- Removing bubbles
- Glue on the insert
- Glue on the tube
- Mounting in the gig
- Gluing the other side
- Mounting the other side on the gig
- Curing on the gig
- The clocking gig
- Natalie sanding
- Lecturing Natalie on the importance of sanding and acetoning
- Closely supervised by a Bob Dylan double
- Curing to full strenght