BLAST-Pol Unification Day

On Friday the 13th, BLAST-Pol was more-or-less completely assembled, with the cryo and gondola halves mated. The SIP was installed in the morning, and the cryostat, receiver, DAS, and star cameras in the afternoon.

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>