On Friday the 13th, BLAST-Pol was more-or-less completely assembled, with the cryo and gondola halves mated. The SIP was installed in the morning, and the cryostat, receiver, DAS, and star cameras in the afternoon.
|
||||
BLAST-Pol Unification DayOn Friday the 13th, BLAST-Pol was more-or-less completely assembled, with the cryo and gondola halves mated. The SIP was installed in the morning, and the cryostat, receiver, DAS, and star cameras in the afternoon. |
Leave a Reply