Yesterday the cryostat was closed, with some modifications to help reduce microphonics. Preliminary signs (which are hard to determine while warm) are that things remain imperfect, but are quite possibly good enough.

Tyr's Christmas present to himself
Skis, for use in Antarctica. He and Brad left us

Barth
And serial converters

Elio performs arts and crafts
In the JFET cavity

The JFET cavity
After the arts and crafts work on the superinsulation layer

Enzo's turn at arts and crafts

Eccosob layer
This seemed to really help with the noise

The partially closed cavity
With cables all reattached, and the intermediate lid in place

Enzo inspects the half-wave plate

Half-wave plate rotator
Getting an inspection

JFET cavity closed

Fridge with optics box back in place
Obligatory. Also, without the extra strapping from last cooldown

The BOB side

Heat strap and window

Cleaning a superinsulation layer

Taping the last layer closed

Box label unrelated to cryostat
If M Truch ever officially designated a representative, I don't recall. I suppose none of us are allowed to modify the box without him... 🙁
Leave a Reply