There was a ton of work to do in the week leading up to compatibility. (Sadly, this means not so many pictures.) We had failed to adequately consider solar panel frames until a little late in the campaign, so there was a rush to get this together. Anne did most of the work, and because I’d dumped the job on her, I felt compelled to help when I could. Many others helped as well. Or did other jobs. Everyone was busy.

Test fitting the solar panel frame

Anne and Natalie wrestle it into place

Science. Ed and I watch while Theo "burps" cryogens
This daily ritual helps deal with cryogenic difficulties

Riveting party
Over in the welding shop, completing the second solar panel frame

Anne tapping

Jamil tapping

Natalie makes rivet art
Using the pneumatic rivet tool

Old books

Strut fitting

Poking out of the highbay

Johanna and Sean wrap up after the sun shields are lifted

Don (with Laika's help) found a skull

Skull
(Don't mess with Texas)

Natalie battles GPS
A noble tradition

Spider is outside!
OUTSIDE!

Outside testing pointing sensors
In preparation for Compatibility later in the week

Outside, in profile

The whole scene

Ruhl cal
Light pipes fed from a central source

Rivet art

Anne finishes mounting solar panels
On the night before compatibility
Leave a Reply