(Backlog from the 3rd to 4th of November.)
With our cargo finally unpacked, and a large team all in place, we’re ready to work. We break up into several teams and work our asses off. (Continued ass-off working is my excuse for slowness in posting.) Several teams operate in parallel: preparing the vacuum vessel/cryostat (aka Theo), preparing SPIDER’s six telescope inserts, and building the gondola frame.

Removing the cherry picker
To free up valuable highbay space

Cornhole boards used for science!
Supporting the inner tube that lifts the bottom dome into place

Opening the bottom dome
With Jon and Anne

Ed prepared for top dome removal

Meanwhile, Jamil has been recruited to team insert
He opens a telescope insert to prepare it for flight

Anne performs the top dome magic
She is the master of this magic

Nat operates the hoist

Top dome opening

Top dome on its cart

Jon and the open bottom
Showing the six telescope ports

Opened telescopes

SPIDER hoodies

Jamil fiddles with telescope prep

Ed too

Insert land
The area beneath the mezzanine is dedicated to telescope prep

Anne fixes the tops of some telescopes

Lorenzo examines a focal plane
The shiny dark parts are our fancy supercondiucting detectors

Meanwhile, gondola assembly starts
Seans helps build the cart

Ivan too

A complete telescope focal plane (top) and fridge (bottom)

Focal plane with optics in background

Barth's horrible chair
Specially shipped for his comfort

Colourful wiring
In telescope insert

Ivan triumphs over Sean in arm wrestling
In the battle of the "Johns"

Anne makes a helium membrane to seal the the telescopes

Gondola assembly

Obligatory Joseph photo
He had recenty showed up

Bottom preparations
WIth SPIDER sweater

SPIDER shoes
Jamil wins

Installing the reaction wheel

Lorenzo shows where to photograph
As I document the finished focal planes before they get covered by telescope optics

A bug in the vacuum vessel
Presumably its been there a while

Sasha examines a focalplane
Leave a Reply