It’s been a bit of a crazy time here. We received notice around 10 days ago that our campaign would be shorter than we expected, so we scrambled to be ready as soon as possible. A flurry of work followed turning Spider from mostly working to ready to fly.
As I type this, the balloon is inflating to (I really really hope) launch Spider, on our fourth attempt.

Penguin me
Turns out skua had a section for free onesies

TRPNS
Measuring polarization angles

Magnetometer
A compass to help us not point at the sun

Shiny sun shields

Preparing to install the SIP
NASA's communication electronics

RIgger power
One of the most straightforward ways to install things

Final adjutments

The back of Spider
Seen for nearly the last time, before being covered by sun sheilds

Final adjustments at the back

The pivot hole
BIll ropes the pivot to the top of the sun shields

Sun shields on!

Requires a lot of "adjustment"

More extra adjustment to align the wing tip

Delta ride
Becuase the bigger more comfortable buses were broken

Joseph wiring up antennas
Now that the sun shield, with antennas on top, is mounted

The wing

The solar panel
Brought over after assembly in the other higbay

Solar panel wiring

Non-magnetic connector for Maggie

Inside Ivan the Terrabus
A pretty full ride

Steve's dent
Is flying, apparently

Heading outside
For antenna testing

This side out

Spider outside again

Cleaning up the empty bay
Like a hero

An extra TDRSS antenna
For testing

Susan + Spider
Posing while outside

Corwin + Spider

More sun shield wiring

Chainsaw truck!
Digging a cable trench to the theodolite

Solar panel lifting

Wrestling into place

Do Not Wiggle

Bill Wiggles

Making baffle blackeners

Flight computer surgery
For the "last time"

Clever computer stand
Of exact calibrated ehight

Crane anti-rotation device
To allow our pivot to control rotation

Brick compatiblilty
This is a test payload in case they get a chance to launch a BIG 60 mcf balloon

Jared makes (shiny) waves

Unsticking The Boss
Which sunk in the soft snow at LDB

Boxing the mushroom
The Iridium Pilot antenna

Spider mostly assembled

"Swiss cheese" braces in palce

Closing the pivot hole
In the sun shields

Finishing up the baffle outer coverings

Test lock actuators

Building a box around the elevation motors
Which stick out outsside the sun shield frame, a little bit

Bracing reinforcements

Group action
On HWP motors, and making more things shiny

First baffle installed

The complete wing side

The mini-monitor
Always a good sign when that comes out

Draw bars
Used for balance weight. We buy out the Tractor Supply in Palestine to get these

All the baffles installed

Sun shield hole to access computer

Spider
Starting to look kind of complete

Modeling lab PPE

Inside the gondola floor

Extra tape
As a proxy for what we'll add after the official weigh-in

Sho climbs the narrow gap
To try to reach between gondola and sun shields

Lift test drive
For the operation to disconnect out pump just before launch

Slow cooked spider

Do Wiggle!
At long last

Solar panels, and braces

Pump on the floor
To allow us to scan while pumping

Belly and floor

Poking at MCEs

Pump hole
To allow the last minute swap, and quick tape-over.

Bitsy Rules!
Leave a Reply