Other than coding (which yields very exciting pictures, and huge amounts of movement in timelapse videos) yesterday’s work consisted of the beginnings of side-scoop gluing, and assembly of the primary/secondary mirror.
After dinner we had a few drinks outside the hotel. One of the locals brought over a frog to which he had given a lit cigarette. Update: I got a picture of the poor frog from Matt’s flickr stream.
- Natalie models the CSBF T-Shirt from the visitor’s center. It is in the second coolest blue there is
- The monster sighted last week has again preyed on an unsuspecting Natalie
- Lorenzo with his star camera opened up
- Gluing time
- Tubes and inserts, ready to be glued
- Tube gluing (after cleaning, sanding)
- Insert insertion
- Fitting the glued tube between the joints already mounted on the inner frame
- Matt takes a hit of Helium. Sweet, sweet helium
- Elio prepares the secondary mirror mount
- Scotch Brite: useful scientific tool
- Strutting the struts. They need support while the secondary is unmounted
- Elio soldering a new receiver backplane
- Mark becomes the second person caught napping (box reads “FRAGILE ↑”)
- The smoking frog. Can you decide whether to laugh or cry?
Leave a Reply